Small transformer maintenance of common sense

Sort:Industry news Date:2017-09-29 view count:1050 【back】

Maintenance steps

1, put into standby transformer, disconnect the overhaul of the low voltage side of transformer circuit breaker, remove the holding power of insurance operation, the switch handles hang "stop closing tag" brand.

2, disconnect the overhaul of transformer high voltage side circuit breakers, close the grounding switch, the transformer enough after discharge, lock the high voltage, the switch handles hang "stop closing tag" brand.

3, care of dry type transformer, first clean porcelain bushing and the shell, the second review of the shell, gasket, porcelain bushing without break, discharge or rubber gasket for aging, cable and bus bar for the deformation, rupture should be change.

4, review the bus interface is clean, interface should remove the oxide layer and coated with electricity compound.

5, review the grounding transformer are in good condition, whether the ground corruption, corrupt serious should exchange.

6, fastening wire terminals, pin, grounding screw, wire bus screws, such as loose should remove the screws, or with a flat file file interface, or change the spring washer, screws, until the good contact.

7, clean the dirt on the transformer and accessories surrounding, review of fire control facilities and ventilation system are in good condition.

8, the grounding switch, disconnect the high side and lock the high-pressure joint comb, the insulation resistance is measured by 2500 v shaking table. And measured value compared with the transformer before they leave the factory, the insulation resistance should not be less than 70% of the raw data when delivery from factory, if fail should timely report the disposal.

9, again on the high side grounding switch, transformer in discharge.

10, review the transformer room, and transformer for legacy tools, leave the scene.

11, connected to low voltage side circuit breaker in the power of insurance operation, to hang "stop closing tag" brand, to prevent the sending to the transformer.

12, disconnect the high side grounding switch, review again on the low voltage side of transformer field and hold the line, right, after close the transformer high voltage side circuit breaker, let removed high voltage side of transformer test mark card.

13, do the commissioning care records in detail.

Security considerations


1, wave measuring insulation resistance necessary for two people.

2, before not to charge and discharge transformer, it is forbidden to touch.

3, prevent to the transmission and transformer to run in the bus transmission.

4, the people care should wear insulated shoes, wear insulated gloves.

5, it is forbidden to false switching.